TM 9-2320-269-20-2
BLOWER ASSEMBLY - CONTINUED
INSTALLATION - CONTINUED
NOTE
FOLLOW-ON MAINTENANCE:
Connect battery ground cable (page 2-414).
TASK ENDS HERE
HEATER ASSEMBLY, HEAT CONTROL, AND VENT CONTROL
This task covers:
e.
INITIAL SETUP
Tools
Materials/Parts - Continued
Brush, parts cleaning
Rags, wiping (item 24, appendix C)
Chisel, cold, hand, 3/8-inch
Solvent, drycleaning (item 28, appendix C)
Hammer, ball-peen, machinist's,
Tags, marking (item 29, appendix C)
2-oz
Wire, safety (item 36, appendix C)
Key, socket-head screw, 5/64-inch
Personnel Required
Knife, pocket
Pliers, long-nose
One
Screwdriver, cross-tip, number two,
1 1/2-inch
Equipment Condition
Screwdriver, cross-tip, number two,
4-inch
Battery ground cable disconnect (page 2-414)
Screwdriver, flat-tip, 3/16-inch
Right side of hood open (page 2-7)
Socket, deep well, 3/8-inch drive,
Cooling system drained (page 2-265)
9/16-inch
Surge tank removed (page 2-223)
Materials/Parts
Cement, rubber (item 6, appendix C)
Lockwasher, heater-to-firewall
(three required)
Nuts, self-locking, heater-to-
firewall (three required)
Pushnut, heat cable-to-heater door
Pushnut, vent cable-to-vent door
2-1269