TM 9-2320-269-20-2
DERRICK OPERATOR'S FLOW CONTROL VALVE - TO - DERRICK OPERATOR'S CONTROL VALVE HOSE
ASSEMBLY - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION
NOTE
Before installing hose assembly, wrap all clean, external threads with two turns of teflon
tape (page 2-142).
6.
Flow control valve
Tee-to-tee
Screw on, and tighten using 7/8-inch
tee (1) to control
hose assembly (3)
and 1-inch wrenches.
valve tee (2)
NOTE
FOLLOW-ON MAINTENANCE:
1.
Fill with hydraulic fluid (LO 9-2320-269-12).
2.
Operate auxiliary equipment (TM 9-2320-269-10), and check for proper operation and leaks.
TASK ENDS HERE
TA229312
2-1131