TM 9-2320-269-20-2
CHECK VALVE - TO - FLOW CONTROL VALVE TEE HOSE ASSEMBLY - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
7.
Two swivel
Check valve-to-
Screw on, and tighten using 7/8-inch
adapters (2)
flow control valve
and 1-inch wrenches.
tee hose
assembly (3)
8.
Hose assembly (1)
Screw on, and tighten using 7/8-inch
valve tee (4)
and 1-inch wrenches.
NOTE
FOLLOW-ON MAINTENANCE:
1.
Fill with hydraulic fluid (LO 9-2320-269-12).
2.
Operate auxiliary equipment (TM 9-2320-269-10), and check for proper operation and leaks.
3.
Raise operator's platform (TM 9-2320-269-10).
TASK ENDS HERE
TA229301
2-1111