TM 9-2320-269-20-2
LEFT SIDE OUTRIGGER CONTROL VALVE -TO - SOLENOID VALVE HOSE ASSEMBLY - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSPECTION/REPLACEMENT- CONTINUED
4.
Hose assembly (3)
a.
Look for crack, breaks, tears, and
b. Look for loose connectors.
c. Look for damaged threads.
5.
All threaded parts
Look for stripped and gouged threads.
INSTALLATION
NOTE
Before installing hose assembly, wrap all clean, external threads with two turns of teflon tape (page 2-
142).
6. 90% swivel
Left side outrigger
Screw on, and tighten using 7/8-inch and
adapter (1) and
control valve-
1-inch wrenches.
NOTE
FOLLOW-ON MAINTENANCE:
1. Fill with hydraulic fluid (LO 9-2320-269-12).
2. Raise operator's platform (TM 9-2320-269-10).
TASK ENDS HERE
TA229324
2-1155