TM 9-2320-269-20-1
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION
NOTE
If governor was removed for access to other components, go to step 8.
Check tags on hoses from removal to insure proper hookup.
7.
Governor (1) and
Three hoses (3)
Screw in, and tighten using 7/16-
two elbows (2)
inch and 3/4-inch wrenches.
8.
Bracket (4)
Governor (1)
Seat elbow (5) on pipe (6), and hold
9.
Bracket (4)
Two screws (7), and
a. Put washers (8) on screws (7).
flat washers (8)
b. Put in.
10.
Two screws (7)
(9) and nuts (10)
b. Screw on nuts (10), and tighten using
two 1/2-inch wrenches.
11.
Elbow (5)
Linenut (11)
Screw on, and tighten using 7/16-inch
and 9116-inch wrenches.
NOTE
If governor was removed to gain access to other components, go to FOLLOW-ON MAINTENANCE (page 2-605).
12
Three
Three hoses (3)
With assistant, screw on, and tighten using
-inch and inch wrenches.
2-604