TM 9-2320-269-20-1
INSTALLATION - CONTINUED
NOTE
FOLLOW-ON MAINTENANCE:
TASK ENDS HERE
HAND CONTROL VALVE ASSEMBLY
This task covers:
INITIAL SETUP:
Tools
Materials/Parts
Extension, 3/8-inch
drive, 5-inch
Tags, marking (item 29, appendix C)
Tape, teflon (item 32, appendix C)
Socket, 3/8-inch drive, 9/16-inch
Wrench, open-end, 9/16-inch
Personnel Required
Wrench, open-end, 5/8-inch
One
Equipment Condition
2-605