TM 9-2320-269-20-1
AMPERE, WATER TEMPERATURE, AND OIL PRESSURE GAGES - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION
5.
Instrument panel (5)
Gage (6) and Put in, and hold in place.
bracket (7)
6.
Two gage studs (1)
Two mounting
Screw on, and tighten using 3/8-
inch
nuts (4)
socket and handle.
7.
Two lead wires (3)
a.
Take off tags.
b.
Put on.
8.
Two lead wire
Screw on, and tighten using 3/8-inch
nuts (2)
socket and handle.
NOTE
FOLLOW-ON MAINTENANCE:
TASK ENDS HERE
TA228778
2-317