TM 9-2320-269-20-1
TORQUE RODS - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION
11. Crossmember (1)
Bracket (2) and
Put against crossmember (1), and
torque rod (3)
hold in place.
12. Crossmember (1)
Two flat washers
a.
Put screws (5) with flat washers
and bracket (2)
(4), screws (5),
(4) through.
and nuts (6)
b.
Put nuts (6) on, and tighten to 250-
275 ft-lb (339-373 N m) of torque
using 1 118-inch socket, torque
wrench with 1/2-inch drive, and
1 1/8-inch open-end wrench.
13. Axle bracket (7)
Torque rod (3)
Put into bracket (7).
14. Axle bracket (7)
Shaft (8)
Drive through using ball-peen hammer an d
and torque rod (3)
brass driftpin.
15. Shaft (8)
Two nuts (9)
Put on, and tighten to 250 ft- lb
(339 N m) of torque using 1 11/16-
inch socket, torque wrench with 1(2-
inch drive, and 1 11/16-inch open-end
wrench, or until nut slot (9) matches
shaft (8) hold.
16. Two nuts (9) and
Two new cotter
Put through, and bend over using diagonal
shaft (8)
pins (10)
cutting pliers.
17. Torque rod (3)
Two clamps (11) and
Put on, and hold in place.
hoses (12)
18.
Two screws (13) and
Put in, and tighten using 7/16-inch
socket and handle with 318-inch drive.
19. Vehicle(15)
Forward-rear
a.
Using jack, lift one side, take out
axle (16)
trestle, and lower axle (16).
b.
Repeat for other side.
20.
Two front tires (17)
Take out chocks.
2-702