TM 9-2320-269-20-1
TRANSMISSION OIL COOLER LINES - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
REMOVAL - CONTINUED
1.
Two clamps
Screw (3),
a. Using 112-inch socket, handle, and
(1) and (2)
lockwasher (4),
1/2-inch wrench, unscrew and take off.
and nut (5)
b. Get rid of lockwasher (4).
2.
Line (6)
Clamp (1)
Spread open, and take off.
NOTE
If clamp only is being removed, go to INSTALLATION.
3.
Coupling (7) and
Line (9)
Using 1 1/16-inch and 1 1/4-inch
elbow (8)
wrenches, unscrew and take off.
INSTALLATION
NOTE
If clamp only is being installed, go to step 5.
4.
Elbow (8) and
Line (9)
Screw on, and tighten using 1 1116-
coupling (7)
inch and 1 1/4-inch wrenches.
5.
Line (9)
Clamp (1)
Put on, and press together.
6.
Two clamps
Screw (3), new
Screw in, and tighten using 1/2-inch
(1) and (2)
lockwasher (4),
socket, handle, and 1/2-inch wrench.
and nut (5)
TA228860
2-456