TM 9-2320-269-20-1
PRIMER SWITCH
This task covers:
INITIAL SETUP
Tools
Personnel Required
Pliers, slip-joint, straight-nose
One
Materials/Parts
Equipment Condition
Tags, marking (item 29, appendix C)
Battery ground cable disconnected
ACTION
LOCATION
ITEM
REMARKS
REMOVAL
1.
Switch (1)
Nut (2) and Using pliers, unscrew and take off.
plate (3)
2.
Instrument
Switch (1)
Push through, and take out.
panel (4)
3.
Two terminals (5)
Two lead wires (6)
a. Take off.
INSTALLATION
Two terminals (5)
Two lead wires (6)
a.
Take off tags.
B.
Tag wires (6)
5.
Instrument
Switch (1)
Put through.
panel (4)
6.
Switch (1)
Plate (3)
Put on.
7.
Nut (2)
Screw on, and tighten using pliers.
2-364