TM 9-2320-269-20-2
HEATER ASSEMBLY, HEAT CONTROL, AND VENT CONTROL - CONTINUED
INSTALLATION - CONTINUED
NOTE
FOLLOW-ON MAINTENANCE:
1.
2.
Install surge tank (page 2-223).
3.
Fill cooling system (page 2-265).
4.
Close left side of hood (page 2-7).
5.
Connect battery ground cable (page 2-414).
TASK ENDS HERE
DEFROST CABLE
This task covers:
INITIAL SETUP:
Tools
Materials/Parts
Chisel, cold, hand, 3/8-inch
Pushnut, defrost cable-to-
Hammer, hand, ball-peen,
defroster door arm
machinist's
Key, screw, socket-head, 5/64-inch
Personnel Required
Pliers, long-nose
Screwdriver, flat-tip,
One
3/16-inch
2-1289