TM 9-2320-269-20-2
HEATER ASSEMBLY, HEAT CONTROL, AND VENT CONTROL - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
84.
Dashboard (1)
Vent control
Route into place, and push in.
cable (2)
85.
Vent control
Nut (3)
Screw on, and tighten using hammer and
cable (2) to
chisel to dive clockwise.
dashboard (1)
86.
Vent control
Knob (4)
Put onto cable shaft, and line up hole
cable (2)
in knob with hole in shaft.
87.
Knob (4) to
Setscrew (5)
Screw in, and tighten using key.
Vent control
cable (2)
88.
Dashboard (1)
Heat control
Route into place, and push in.
cable (6)
89.
Heat control
Nut (7)
Screw on, and tighten using hammer and
cable (6) to
chisel to drive clockwise.
dashboard (1)
90.
Heat control
Knob (8)
Put onto cable shaft, and line up hole
cable (6)
in knob with hole in shaft.
91.
Knob (8) to
Setscrew (9)
Screw in, and tighten using key.
Heat control
cable (6)
92.
FANITEMP
Red wire (12)
a. Check tag for location.
switch (10) to
b. Route into place, and plug in.
terminal L(11)
93.
FAN/TEMP
Orange wire (14)
a. Check tag for location.
switch (10) to
b. Route into place, and plug In.
terminal H (13)
94.
Dashboard (1)
FAN/TEMP
Put into place from behind.
switch (10)
2-1286