TM 9-2320-269-20-2
HOOD ASSEMBLY
This task covers:
INITIAL SETUP
Tools
Materials/Parts
Bit, drill, 3/16-inch
Cement, rubber (item 6, appendix C)
Board, support (two required)
Cotter pins, hood hinge pin
Drill, electric, portable
(four required)
Extension, 3/8-inch drive, 5-inch
Lockwasher, hood center panel to radiator
Hammer, ball-peen, machinist's
shell support (two required)
Lockwasher, hood handle to hood latch
Pliers, long round-nose
Lockwasher, hood prop to hood
Pliers, slip-joint, straight
Nut, self-locking, hood prop
Punch, drive-pin, straight, 1/8-inch
to bracket (two required)
Riverter, blind, hand
Rags, wiping (item 24, appendix C)
Socket, 3/8-inch drive, 3/8-inch
Rivets, blind(eight required)
Socket, 3/8-inch drive, 7/16-inch
Seal, hood ledge
Socket, 3/8-inch drive, 1/2-inch
Solvent, drycleaning (item 28, appendix C)
Socket, 3/8-inch drive, 9/16-inch
Wrench, box-end, 7/16-inch
Personnel Required
Two
Equipment Condition
Right and left side hoods open
(page 2-7).
2-774