PRIMARY AIR RESERVOIR
This task covers:
INITIAL SETUP
Tools
Materials/Parts
Brush, wire
Chalk, carpenter's, (item 7, appendix C)
Extension, 3/8-inch drive, 6-inch
Oil, penetrating (item 23, appendix C)
Tags, marking (item 29, appendix C)
Socket, deep-well, 3/8-inch drive,
Tape, Teflon, marking (item 32, appendix C)
9/16-inch
Wrench, open-end, 3/4-inch
Personnel Required
Wrench, open-end, 7/8-inch
Wrench, open-end, 15116-inch
One
Wrench, open-end, 1 116-inch
Wrench, open-end, 11/16-inch
Wrench, pliers
Equipment Condition
Battery ground cable disconnected
ACTION
LOCATION
ITEM
REMARKS
REMOVAL
WARNING
Drain air from system before removing lines or fittings to avoid injury to personnel from compressed air.