TM 9-2320-269-20-1
OIL PRESSURE GAGE SENDING UNIT
This task covers:
INITIAL SETUP
Tools
Personnel Required
Wrench, open-end, 3/8-inch
One
Wrench, open-end, 9/16-inch
Equipment Condition
Materials/Parts
Battery ground cable disconnected
Tape, teflon (item 32, appendix C)
ACTION
LOCATION
ITEM
REMARKS
REMOVAL
1.
Sending unit (1)
Nut (2)
Using 3/8-inch wrench, unscrew and take
off.
2.
Lead wire (3)
Take off.
3.
Elbow (4)
Sending unit (1)
Using 9/16-inch wrench, unscrew and take
out.
INSTALLATION
4.
Elbow (4)
Sending unit (1)
a.
Wrap clean threads with teflon tape
b.
Screw in, and tighten using 9/16-inch
wrench.
5.
Sending unit (1)
Lead wire (3)
Put on.
6.
Nut (2)
Screw on, and tighten using 3/8-inch
wrench.
2-398