TM
ll-5805-587-15/3
TO 31W2-l-471-3
Daily Preventive Maintenance Checks and Service's,
If the equipment must be
kept in continuous operation,
Note:
check and service only those items
that can be checked and ser-
viced without disturbing operation;
make complete checks and
cervices when the equipment can be
shut down or during periods of
Sequence
References
Procedure
Item
No.
Para 4-102
Check input and
Battery chargers
output volt-
age and
charging cur-
rents. Ad-
just, if nec-
essary.
Using the ac
None
Ac-dc inverters
check the
output volt-
age at the
test jacks.
Indication
should be
112 to 124
volts.
Para 4-98
Check signal
levels and
output fre-
quencies. Ad-
just, if nec-
essary.
Check operation
Chap 4,
Translator equipment
and transfer
Sect VI
features.
Check operation
Chap 4,
Multifrequency gen-
and transfer
Sect V
erator
features.
Check operation
Chap 4,
6
and transfer
Sect V
features.
COS millipulse gen-
Para 4-39
Check operation
and transfer
erator
features.