TM 9-2320-269-20-2
AIR PRESSURE GAGES - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
11.
Two studs (6)
Two nuts (7) and new
Screw on, and tighten using 3/8-inch
wrench.
NOTE
If both gages were removed, check tag markings from removal to insure proper hookup.
12.
Fitting (4)
Line (9) and line
Screw on. and tighten using two 9/16-
nut (10)
wrenches
NOTE
FOLLOW-ON MAINTENA NCE:
1.
Connect battery ground cable (page 2-414).
2.
Close reservoir draincocks (page 2-106).
3.
Check gages for proper operation (TM 9-2320-269-10).
TASK ENDS HERE
TA229701
2-13571(2-1358 blank)