TM 9-2320-269-20-2
RIGHT OUTRIGGERS HYDRAULIC DRIVE LINES - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
20.
Outrigger
Two outrigger
a. Check all tags for correct locations.
link (1) and
control valve-to-
b. With help from assistant, and
outrigger control
right front hose
using fish tape, put in position.
valve (2)
assemblies (3) and (4)
21.
Outrigger link (1)
Two screws (6)
a. Take off tags.
and two hose
b. With hoses (3) and (4) positioned at
clamps (5)
adapters (7) and (8) and clamps (5),
screw in, and tighten using 7/16-inch
socket and handle.
22
Two adapters
Two swivel adapters
Screw in, and tighten using 9116-inch
(7) and (8)
(9) and (10)
and 11/16-inch open-end wrenches.
23.
Two swivel
Two outrigger
a. Take off tags.
adapters (7) and (8)
control valve-to-
b. Screw on, and tighten using 9/16-inch
right front hose
and 11/16-inch wrenches.
assemblies (3) and (4)
TA229239
2-1019