TM 9-2320-269-20-1
SECONDARYISUPPLY AIR RESERVOIR - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
36.
Lines (1), (2),
Clamp (4)
Put on, and press together.
and (3)
37.
Bracket (5) and
Two screws (7), new
a. Put in screws (7) with new lock-
two clamps (4)
washers (8).
and (6)
and nuts (9)
b. Screw in nuts (9), and tighten using
7/16-inch socket, extension,
handle, and 7/16-inch wrench.
38.
Lines (1) and (2)
New cable tie (11)
Wrap around, and pull tight.
and cable (10)
39.
Coupling (12)
Line (13) and line-
Screw in, and tighten using two 9/16-
nut (14)
inch wrenches.
40.
Brackets
Reservoir (17)
Slide inward against back of brackets
(15) and (16)
(15) and (16).
41.
Fitting (18)
Line (19) and line-
Screw in, and tighten using 15/16-
nut (20)
inch wrench.
42.
Bracket (15)
Two cables (21) and
a. Put cable (21) in.
four nuts (22)
b. Screw in nuts (22), and tighten using
9/16-inch deep well socket, extension,
handle, and pliers wrench.
TA228943
2-582