TM 9-2320-269-20-2
DEFROSTER DUCT - CONTINUED
INSTALLATION - CONTINUED
NOTE
FOLLOW-ON MAINTENANCE:
1. Connect battery ground cable (page 2-414).
2. Close air system drain valves (page 2-106).
3. Check operation of defroster duct (TM 9-2320-269-10).
TASK ENDS HERE
DEFROSTER DUCT BRACKET
This task covers:
INITIAL SETUP
Tools
Personnel Required
Extension, 3/8-inch drive, 6-inch
One
3/8-inch drive
Equipment Condition
Socket, deep-well
3/8-inch drive, 1/2-inch
Left side of hood open (page 2-7).
2-1255