Chapter 1. INTRODUCTION - TM-11-6625-1668-120005Figure 1-1. Test Set, Telegraph AN/GGM-15(V)1.Figure 1-2. Test Set, Telegraph AN/GGM-15(V)2.Section II. DESCRIPTION AND DATA - TM-11-6625-1668-120008Description of Major ComponentsFigure 1-3. Case, Test Set CY 1-4 672/GGM-15(V).Figure 1-4. Dolly, Testt Set V-434/GGM-15(V).Figure 1-6. Cable Assembly, Special Purpose Electrical, Branched CX-12024/GGM-15(V).Technical Characteristics - TM-11-6625-1668-120013Technical Characteristics - continued - TM-11-6625-1668-120014Technical Characteristics - continued - TM-11-6625-1668-120015Technical Characteristics - continued - TM-11-6625-1668-120016Chapter 2. INSTALLATIONFigure 2-1. TS-2862/GGM-15(V0, typical domestic packaging.Figure 2-3. V-343/GGM-15(V), typical domestic packaging.Figure 2-5. TS-2862/GGM-15 (V) assembly, card and fuse load.Reference DesignationsShelter RequirementsFigure 2-7. Power transformer strapping options.Figure 2-8. AN/GGM-15(V), mounting dimensionsFigure 2-9. AN/GGM-15 (V), cable connections.Installation of Fuses and Crystals Initial AdjustmentChapter 3. OPERATIONFigure 3-1. SG-860/GGM-15(V), controls and indicators.Analyzer Front Panel Co ntrols, Indicators, and ConnectorsOscilloscope Front Panel Controls and IndicatorsOscilloscope Front Panel Controls and Indicators - continuedSection II. OPERATING PROCEDURESFigure 3-4. Types of distortion.Generator Operating ProcedureFigure 3-5. Free-run message operation (high level neutral).Illustration - TM-11-6625-1668-120037Free Run Selected Character OperationFigure 3-7. Free run selected character operation (high level).Typical EXT message operationAnalyzer Operating ProceduresAnalyzer Operating Procedures - continued - TM-11-6625-1668-120042Analyzer Operating Procedures - continued - TM-11-6625-1668-120043Analyzer Operating Procedures - continued - TM-11-6625-1668-120044Distortion Measurements.Oscilloscope Operating ProceduresOscilloscope Modes of OperationVertical Input ControlOperation in Arctic ClimatesChapter 4. MAINTENANCEWeekly Preventive Maintenance Checks and ServicesQuarterly Preventive Maintenance Checks and ServicesAnalyzer Self-Test (Error Test Mode)Troubleshooting ProcedureTroubleshooting Chart - TM-11-6625-1668-120055Chapter 5. SHIPMENT, LIMITED STORAGE, AND DEMOLITION TO PREVENT ENEMY USESection II. DEMOLITION OF MATERIAL TO PREVENT ENEMY USEAppendix A. REFERENCES - TM-11-6625-1668-120058Appendix B. MAINTENANCE ALLOCATION - TM-11-6625-1668-120059Explanation of FormatSection II. MAINTENANCE ALLOCATION CHART - TM-11-6625-1668-120061Table I. TOOL AND TEST EQUIPMENT REQUIREMENTSAppendix C. ORGANIZATIONAL REPAIR PARTS AND SPECIAL TOOL LISTSLocation of Repair ParksSECTION II. PRESCRIBED LOAD ALLOWANCE LISTSECTION III. SPECIAL TOOLS, TEST, AND SUPPORT EQUIPMENT FOR ORGANIZATIONAL MAINTENANCESECTION IV. REPAIR PARTS FOR ORGANIZATIONAL MAINTENANCEREPAIR PARTS FOR ORGANIZATIONAL MAINTENANCESECTION V. FEDERAL STOCK NUMBER CROSS-REFERENCE INDEXTM-11-6625-1668-12 Test Sets Telegraph AN/GGM-15 (V) 1 (NSN 6625-00-464-1702) AN/GGM-15 (V) 2 (NSN
6625-00-442-6131) Manual