TM 11-5805-246-10
2-3. ASSEMBLY AND PREPARATION FOR USE. (CONT)
This task covers:
Preparation for use
INITIAL SETUP
Personnel Required
Tools
One technician
Tool Kit, Electronic Equipment
TK-100/G
Equipment Condition
Materials/Parts
Not in operation
None
ACTION
REMARKS
ITEM
LOCATION
WARNING
Wear heavy gloves and protective eye wear when cutting
straps.
Cut straps and fold back.
1.
Top of wooden box
Steel straps (1)
Using nail puller, remove.
2.
Lift each container out of box.
Fiberboard
3.
Below top of
container (3)
wooden box
Using knife, cut.
Pressure sensitive
4.
Top of fiberboard
tape (4)
container
Remove pads from equipment.
Fiberboard pads (5)
Around unit
5.
Remove running spares.
Running spares (6)
Inside fiberboard
6.
container
Fold back sides of container and remove
Running spares
7.
Sides of package
contents.
container (6)
Remove.
Technical
Top of fiberboard
8.
manual (7)
container
Remove.
Telegraph
Inside fiberboard
9.
container
terminal (8)
2-16